Wrong forum Chris Gayle

first_imgWhat is the problem with Christopher Henry Gayle that is causing this continuous display of his manhood and sexuality in the public space?The T20 cricket batting superhero had another on-air amorous approach aimed at a female journalist conducting a post-performance interview during a game in the Australian Big Bash League (BBL).It was only last year, on Antigua home soil, that Big Chris committed what Foster’s Fairplay assessed then and still now, as a trend towards vulgarity.On that occasion, in a pre-game interview, the former West Indies captain was reported to have been asked by a female interviewer: “How does the pitch feel so far in terms of the training (and) the weather”?The response was: “Well, I haven’t touched yours yet, so I don’t know how it feels.”The question in this columnist’s view did not indicate cricket savvy, but Gayle put the query on a sexist plane.Following the story from Down Under, what is interesting is a comment by a Jamaican sports journalist considered, in this corner, to be ‘from the top drawer’.FOOT-IN-MOUTH DISEASENoted for his incisive analysis, after listening to excerpts from the recent interview with Gayle and the woman, he made the point: “I thought Gayle had learnt his lesson.”No such luck, Leighton. There is no stopping the loose talk coming from the swashbuckling opening batsman, as he seems to be stuck in the groove of ‘putting his foot in his mouth’ on these occasions.This time, his 41 off 15 balls was being recounted when what he chose to highlight was his attraction to the lady’s eyes and proceeded to issue an invitation on set for the woman to “have a drink” later.The “Do not blush, Baby” followed.Subsequently, the BBL boss, obviously and justifiably incensed, has issued sanctions against our boy, Chris. First up, he will no longer be featured in the coverage of the games. His wearing of on-field microphones to facilitate comments during the fast-paced spectacle is now denied. Added to this, the now-beleaguered entertainer has been docked US$7,200 (AUS$10,000.)In response to the many negative remarks from all over, there have been shouts of “Overkill!”, “Killing an ant with a hammer!” and the like. The view expressed there is that Gayle’s flirtatious foray did not deserve such adverse comment.In general, it is also the talk that the matter has been “blown out of proportion”. Some have responded to the most popular comment, which is that the approach was “inappropriate”.Another famed radio talk show host and academic has said that the measure of that description is dependent on how acceptable it was to the lady in question, Mel McLaughlin.Also, it has been mentioned that she was made to feel “uncomfortable”, while carrying out the requirements of her job.culture-dependent viewOn the matter of discomfort, the only opinion in the public space has not, to this columnist’s knowledge, come from the lady herself, but rather from what she was alleged to have said to her superior. Foster’s Fairplay is in total disagreement with the highly respected talk show host on the matter of the lady’s acceptability or not. That is immaterial in this corner. Depending on culture, socialisation, or plain lack of decency on the part of the target, the foulest language in requesting sexual attention can find favour in certain quarters but can be rejected, as it should be, in others.This columnist, in his youthful days, trying to adhere to lessons taught, lost many a battle, failing to land the booty, while the vulgar approach won the hand, and whatever else was on offer from the female. Unacceptability is a legitimate call, regardless of its source.As for the suggestion that the story has received an overabundance of mileage, this is how journalists eat, drink, and enjoy life’s blessings. Put a little one-Test medium pacer in the superstar’s position, the hue and cry would be considerably less – if heard at all.The so-called extra publicity comes from the elevated territory, and Gayle and his supporters must be aware of this as they line up in his support.Foster’s Fairplay sums up the varied arguments and counter arguments: It was the wrong forum for the comment.Take the thought elsewhere, Chris.last_img read more

James Harden has 29, Rockets down Pacers

first_imgHouston Rockets guard Chris Paul (3) reacts to a call with official Courtney Kirkland during the second half of an NBA basketball game against the Indiana Pacers, Wednesday, Nov. 29, 2017, in Houston. (AP Photo/Eric Christian Smith)HOUSTON, Texas—After losing just one game in November the Houston Rockets are feeling pretty good about where they are.But James Harden says the best part about how well they’re playing is that they can be much better.ADVERTISEMENT Jake says relationship with Shaina ‘goes beyond physical attraction’ Don’t miss out on the latest news and information. Coco’s house rules on ‘Probinsyano’ set View comments Kiss-and-tell matinee idol’s conquests: True stories or tall tales? LATEST STORIES “They hit some shots in the second half,” Pacers coach Nate McMillan said. “I thought a lot of them we were right there, and sometimes you just have to give some teams credit for executing and making shots.”Trevor Ariza made a 3-pointer in that stretch and Ryan Anderson added two finished with 19 points.The Pacers missed numerous shots, were called for defensive three seconds and committed an offensive foul to allow the Rockets to pad the lead.“Even tonight we had some lapses,” Anderson said. “But we’re a relentless team and we play hard and we know if we stick to the scheme … we know we’re going to win games. So we’re the only thing that gets in our own way.”Young finished with 23 points for the Pacers. They have won seven of their last 10 games.ADVERTISEMENT Houston led by 18 after three, but Indiana scored the first seven points of the fourth to get within 89-78.After a timeout, Chris Paul hit a 3-pointer right before the shot clock expired to give the Rockets their first points of the quarter before he found Ryan Anderson for a rare dunk to make it 94-80 with about nine minutes left.The Pacers tied it early in the third quarter before Houston used a 13-4 run to take a 67-58 lead with about seven minutes left in the quarter. Anderson and Trevor Ariza made consecutive 3-pointers to power that run and Ariza added a second 3 later in that span.Indiana got back on track after that, and used a 6-2 spurt, highlighted by a 3-pointer from Bojan Bogdanovic, to get to 69-64.But Houston scored the next eight points, with the last seven from Harden, to push the advantage to 77-66 with about 2 1/2 minutes left in the third.Victor Oladipo ended an almost 2 1/2 minute scoring drought with a 3-pointer after that. It was then that the Rockets got hot from long-range with P.J. Tucker and Harden making two 3s each to allow Houston to outscore the Pacers 12-2 for the rest of the quarter to make it 89-71 entering the fourth.The Rockets led 54-49 at halftime.Sports Related Videospowered by AdSparcRead Next Coco’s house rules on ‘Probinsyano’ set It’s too early to present Duterte’s ‘legacy’ – Lacson “We’re never satisfied,” he said. “We have a long way to go.”Harden had 29 points, 10 assists and eight rebounds and the Rockets rolled past the Indiana Pacers 118-97 on Wednesday night for their sixth straight victory.FEATURED STORIESSPORTSRedemption is sweet for Ginebra, Scottie ThompsonSPORTSMayweather beats Pacquiao, Canelo for ‘Fighter of the Decade’SPORTSAfter winning title, time for LA Tenorio to give back to Batangas folkThe Rockets improved to 12-1 this month, with the only loss coming on Nov. 14 against Toronto, and their 17-4 record overall is the best in the Western Conference.Thaddeus Young cut the lead to 10 with a hook shot with about eight minutes left. The Rockets put it away with a 16-4 run that made it 110-88 with about four minutes left. MOST READ OSG plea to revoke ABS-CBN franchise ‘a duplicitous move’ – Lacson Lowry scores season-high 36 as Raptors beat Hornets Jake says relationship with Shaina ‘goes beyond physical attraction’ Jo Koy: My brain always wants to think funny Margot Robbie talks about filming ‘Bombshell’s’ disturbing sexual harassment scene Carpio hits red carpet treatment for China Coast Guard PLAY LIST 02:14Carpio hits red carpet treatment for China Coast Guard02:56NCRPO pledges to donate P3.5 million to victims of Taal eruption00:56Heavy rain brings some relief in Australia02:37Calm moments allow Taal folks some respite03:23Negosyo sa Tagaytay City, bagsak sa pag-aalboroto ng Bulkang Taal01:13Christian Standhardinger wins PBA Best Player awardlast_img read more

The day QPR demolished Blackpool on their way to winning promotion

first_imgQPR face Blackpool this weekend and many Rangers fans have fond memories of past matches against the Tangerines. One of the was a 5-0 victory on the opening day of the 2003-04 season. Ian Holloway’s side went on to win promotion.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 Follow West London Sport on TwitterFind us on Facebooklast_img read more

Saving Sustainably: Foundation Formwork

first_imgCompleting the stem wall formsIf I had decided to pour the foundation walls and the slab all at the same time, this would have been all the formwork I needed. But for several reasons, I decided to pour the slab and stem walls separately, so I needed to complete the stem wall forms by adding an inside form 8 inches away from the outside. The double pour will allow for more control, hopefully resulting in a smoother, more level slab. It also allows me to insulate the inside of the footing wall before I pour the slab.Plumbing must be located precisely. Once the slab has been poured, there will be no moving this toilet flange.I set up the second set of form boards exactly 8 inches away from the first, and connected the two sides with scrap wood, placing the scrap at the exact locations where anchor bolts would go. This way, I can use the scrap wood to hold the bolt while the concrete cures around it.Once the second set of form boards were attached and level with the first set, I began straightening them out and bracing them (see Image #4 below). The boards may not look pretty, but they are free and I can’t see spending money on temporary bracing. When it comes time to pour concrete, we will be banging the forms with hammers trying to work the air pockets out of the concrete so I need to ensure the forms won’t move around at all.With the forms perfectly marking out the edges of the house, I now had a reference to place the plumbing. When bracing the main drain line, I maintained a downward slope of 1/4 inch for every foot of pipe all the way through the line to the septic tank. I used the builder’s level to make sure that I was starting at the right spot. Footings clear inspectionAs the date for a required formwork inspection approached, I took care of a few last details (see Image #5 below). These included forming a small point-load footing for the stairway, laying out all the cold water supply lines, and setting up the utility sweeps for the electrical, heat-pump water heater, and ductless minisplit systems. I also made a few minor adjustments to the forms to straighten out the rebar and make sure they were precisely squared and leveled, and laid out the anchor bolts.I’ll be running the hot water lines inside the conditioned space of the house, meaning that they will stay nice and warm at the same temperature as the house. The cold water lines, on the other hand, don’t need that kind of insulation so I am running them underneath the slab alongside the rest of the plumbing I had already installed. I will be using a hybrid type of water supply installation for the cold water lines, meaning it will be halfway between the trunk-and-branch method and the home-run method. The hot water lines will be almost exclusively home runs with one minor exception.With a trunk-and-branch layout, a main supply line travels through the entire house with branch lines serving fixtures such as a toilet or sink. The home-run method means that as soon as the water line enters the house it is piped into what is called a manifold, where it immediately branches off into as many lines as there are fixtures in the house.When dealing with hot water lines, the trunk-and-branch system has a major flaw in that if you want hot water in one of the fixtures and the water currently in the trunk has already cooled off, you have to wait until all of the water in the trunk has exited the fixture before you get hot water. This is not only annoying but also extremely wasteful. The home-run method uses more piping, but solves this problem, ultimately paying off in the long run. For cold water lines this isn’t an issue, so I just ran the piping as efficiently as I could to reduce the amount of PEX piping I needed to buy. Getting the hang of a mini excavatorWhen I was planning the build, I thought seriously about buying a mini excavator. They have great resale value and are incredibly handy. You can use them not only to excavate, but also to raise walls, move dirt around, or just move heavy objects. In the end, I’m glad I decided against it. The thrill of operating one of these machines is an experience I was happy to have, but by the fourth hour or so I was losing interest.It takes about an hour to get pretty good on the controls, so of course the learning aspect of that was an enjoyable challenge. But once you have it down, the digging becomes monotonous and I’m not a fan of diesel fumes. If I had it to do over again I would just use a skid steer to clear the topsoil and level everything and then I would dig the footings by hand. That said, the soil is pretty sandy here so I might feel differently about that if I had to deal with more clay-like soils.After the footing trenches were dug, I used the mini to move the spoils out of the way where they will remain until I finish building and will use it to backfill. I did use some of the soil to add on to my septic field mound just to give it a neater look. I used my level to level the interior and make sure my footings were dug to the proper depth.Now the only thing left as far as digging is concerned was just a few small trenches for utilities (HVAC, water supply, electrical). It’s very gratifying to see the design I have been working so hard on slowly becoming reality (see Image #3 below). Adding steel reinforcementCounty building codes required two runs of horizontal steel rebar at the bottom of the footings and one horizontal run within the top 12 inches of the stem wall. The three horizontal runs must be connected by L-shaped vertical pieces of rebar every 4 feet.One of the more difficult aspects of installing rebar is making sure it’s embedded within the concrete as opposed to just lying on top of it or underneath it. (Most codes require rebar to be no closer to the surface of the concrete than 3 inches). I will be using small blocks called dobies to support the rebar; when the concrete is poured, the rebar will remain the required distance off the ground. The vertical rebar is held upright by tying it to the bottom runs using rebar tie wire. To make things easier, I bought a neat little tool for $15 that quickly and neatly twists the tie wires together as I pulled on the handle.Rebar comes in lengths of up to 20 feet. When you need a run longer than that, two or more pieces must be spliced together. These splices must not occur in exactly the same spots on each run and must be 50 bar diameters in length. Since I am using #4 rebar, the diameter is 4/8 or 1/2 inch, meaning the splice overlap must be at least 25 inches.I noticed that one of my Point Roberts neighbors had an old rebar bender/cutter in his yard, and I asked him if I could borrow it for a week. It was barely holding itself together and at least twice as hard to operate as a newer one, but it did the job and saved me the cost of renting one. RELATED ARTICLES Editor’s note: This is one in a series of blogs detailing the construction of a net-zero energy house in Point Roberts, Washington, by an owner/builder with relatively little building experience. You’ll find Matt Bath’s full blog, Saving Sustainably, here. If you want to follow project costs, you can keep an eye on a budget worksheet here. Building the formsOne of the more intimidating parts of the build has been putting up the form boards. It’s one thing to make an incredibly detailed drawing on a CAD program in which everything is perfect and straight and level. It is quite another to take a crumbly and uneven medium like soil and place forms that will be just as straight and level as the CAD drawing.I’ve thanked myself for sticking to a small footprint many times over the last few weeks as I trudge back and forth from my trusty builder’s level to the grade stake, fine-tuning everything. With outside dimensions of 24 feet by 32 feet, the foundation should have a diagonal measurement of 40 feet — a dimension I can use to check to make sure the foundation has square corners.There are two distinct sections of the foundation: an 8-inch thick stem wall at the top, and a thicker 16-inch-wide footing below it. The soil will act as a form for the footing, and the form boards will create the 8-inch stem wall. Footings and stem walls are both poured at the same time. After adding insulation to the inside of the stem walls, I’ll schedule a second pour for the slabs.To build the forms, I started by running the outside form boards all the way around the foundation. I cut a couple 9-inch blocks to hold the form boards up while I screwed them to the nail stakes. I chose 9 inches because the footing needs to be a minimum of 7 inches deep and I wanted just a small buffer in case any dirt caved in between the time I level the forms and the time the inspector comes to check the depth of the footing. With the unfortunately sky-high concrete prices in the area I will pay about $200 for this buffer, but I’ve decided it is worth it.I set each form board on the blocks and then lifted it up just slightly before screwing it to the stakes I had pounded in. The extra lift at the end is something I learned from my mentor. It is quite simple to nail in a stake just a bit more to lower the form, yet even with incredible strength it is virtually impossible to pull one out of the ground and expect it to stay there. By nailing the form to the stakes just a bit higher than they needed to be I was able to easily fine-tune the forms by pounding a stake down just a bit here or there.I used the builder’s level to decide how much extra to pound each stake in. I used a couple of clamps and a small 2×4 as a jig to hold the grade stake straight on top of the form and then checked the height with the level. Using this point as a reference, I worked my way around the perimeter, clamping the grade stake on top of the form, checking the height against the reference height, pounding the nail stake holding the form down a bit if needed, and then rechecking the height with the level. Once all the forms were level, I measured the lengths of each side and then measured the diagonals to ensure the sides were squared to each other.I decided to use screws rather than nails to attach the forms. Screws are more expensive, but they are easier both to install and to remove once the concrete has been poured. With any luck I will be able to reuse them later on in the build. With the permit approved it was time to break ground! I had already planned to rent a mini excavator and surveyed the lot extensively so I knew where and how I wanted to orient the house. The drawing in Image #2 (at the bottom of the article) shows my foundation plan. You can see the perimeter footings forming a rectangle; the other trenches that run through it will be for plumbing, electrical, and HVAC.Before digging, I needed a game plan. I set up some makeshift batter boards with 2-foot nail stakes and scrap wood and then stretched string lines between them to mark out the inside and outside of the trenches. I measured carefully to ensure the strings were spaced the correct distance apart from each other and also measured the diagonal distances between the corners to ensure that they formed perfect 90° angles.I was careful to leave enough room between the trench and the batter boards for the mini excavator. Once I was sure the lines were straight and square, I notched the batter boards where the strings crossed the board so I could remove them and reset them without measuring again.Next, I marked lines beneath the string lines with spray paint. Unfortunately, I had already gone through one can before I read that I could simply use cornmeal to mark the lines. I bought a bag and put some in a container with a spout on it and just poured it over the string lines. It fell past the string and made a neat line on the ground — yet another way of Saving Sustainably. Once the lines were marked I removed the string lines and hopped on the mini. BLOGS BY MATT BATH An Introduction Green Basics: Slab FoundationsFoam Under FootingsFrost-Protected Shallow FoundationsGreen Basics: Foundation Types Pouring the concreteToday marked another milestone: the concrete was poured (see Image #6 below). As with almost every step in the build so far, there were definitely a few hiccups along the way. But at the end of the day I was pretty pleased with the results.The major hiccup occurred when a couple of the pieces of wood I was using to hold the forms exactly 8 inches apart pulled away from the screws that were holding them in place (see Image #7 below). This wasn’t catastrophic because the bottoms of the forms were held in place by the nail stakes, but it is the top of the forms that is the most crucial, so it was important to figure out how to push them back in place and hold them there.The easiest fix was a little costly, but it worked and in the grand scheme of the build it will be a minor cost. I had one of my friends (thank goodness I had some extra help!) run to the local building supply store and buy some steel spreaders and then we used some 2x4s to lever the tops of the forms back into place and lock them together with the spreaders. I measured it out and the entire pour ended up being less than a 1/2 inch off all the way around the top. Although the bottoms did bow out a little bit, they will be completely covered with dirt. Crisis averted!Another minor hiccup during the pour was that the weight of the concrete inside the forms was so great that it pushed the concrete underneath and up around the outside of the forms. The concrete was supposed to level out as it reached the bottom of the forms and pressed into the dirt, creating an upside down “T.”Structurally, this was not an issue, and again, this part of the pour will eventually be backfilled and completely covered. The problem was that I hadn’t accounted for the additional concrete in my calculations. I had ordered extra but started getting scared that the excess I had ordered wouldn’t be enough to cover it. We solved this problem by pouring the bottom part of the T (the footing) first and then pouring the top half (the stem walls) after the bottom half had cured for roughly a half-hour.This incurred an additional hourly cost for the pump truck driver but running out of concrete would have been catastrophic. As it turned out, we would have had enough, but better safe than sorry. We poured the excess concrete in the area where the slab will go; it will result in needing less gravel in the next phase of the build.last_img read more